Rondd
Newbie
Frame complete - Needs Wiring, plumbing, and engine end prerotator drive:
New 24' Gyro Technic Rotor Blades and hub
Rebuilt Rotor Head by Air Command to new stronger version, New Rotor RPM pickup & indicator
Gray head Rotax 582 converted to 612 by Rotax Rick with 4 hrs breakin
New E gear box
New tuned exhaust
New EarthX Battery, New GRT Engine Information System, New Seat Belt
New Vega ASV-1, New Electric and Engine driven fuel pumps, New Starter Solenoid, and instrument switches
New longer windshield
New tire and tubes, New Brake lines, Old Steam Gauges as shown
Many other items to complete project
Log Books and manuals
Have over $19,000 invested
New 24' Gyro Technic Rotor Blades and hub
Rebuilt Rotor Head by Air Command to new stronger version, New Rotor RPM pickup & indicator
Gray head Rotax 582 converted to 612 by Rotax Rick with 4 hrs breakin
New E gear box
New tuned exhaust
New EarthX Battery, New GRT Engine Information System, New Seat Belt
New Vega ASV-1, New Electric and Engine driven fuel pumps, New Starter Solenoid, and instrument switches
New longer windshield
New tire and tubes, New Brake lines, Old Steam Gauges as shown
Many other items to complete project
Log Books and manuals
Have over $19,000 invested
Attachments
-
IMG_1644.webp181.8 KB · Views: 56
-
IMG_1634.webp226.5 KB · Views: 52
-
IMG_1635.webp250 KB · Views: 51
-
IMG_1636.webp170.3 KB · Views: 50
-
IMG_1637.webp201.4 KB · Views: 51
-
IMG_1638.webp172.4 KB · Views: 48
-
IMG_1639.webp180.3 KB · Views: 47
-
IMG_1641.webp198.1 KB · Views: 49
-
IMG_1642.webp125.8 KB · Views: 49
-
IMG_1643.webp192 KB · Views: 54
Last edited: